MAIN MENU

ROCKETS

Rockets Supplier Quality Requirements, Terms & Conditions, Documents and Forms — Huntsville, AL

Quality Clause SeriesRevisedView/Download
QS-AP-52.0.1 (Q601 through Q652)01/25/2025View/Download
QS-AP-52.0.2 (Q701 through Q757)05/08/2025View/Download
QS-AS-52.0.3 (Q760 through Q774)01/25/2025View/Download

 

Change Request

Are you or your suppliers considering making a change to the manufacturing/test/inspection or special processes. If so, please use the document(s) below to submit a request for review and level of validation determination to GD-OTS.

Process Change Request (PCR) QS-FM-10.7.1
Introduction to Validations
For all Hydra-70 Suppliers and Supplier Sub-tiers, this section provides documents to aid in the understanding of the Program validation process and associated timelines.

Pre-Validation and Process Change Guide For Suppliers Hydra-70 FY20-24

QS-GD-10.7.1
Plan and Report Completion Guide Hydra-70 FY20-24 QS-GD-10.7.2
Validation Flow Chart QS-AP-10.5.1
Documenting The Baseline
For all Suppliers and Supplier Sub-tiers, this section provides documents to be completed prior to the start of production, when specified by contract.

Process flow QS-TP-21.0.1
Process Control QS-TP-21.0.3
PFMEA QS-TP-21.0.2
CCCP – No template NA
SPC QS-TP-21.0.4
Counterfeit parts – No template NA
QAPP – general template QS-TP-31.1.1
First Article & Tailored First Article Plan and Report Templates
For all Hydra-70 Suppliers and Supplier Sub-tiers, the following templates are required for planning and reporting a First Article or Tailored First Article.
FAT Plan Template QS-TP-10.7.1
FAT Report Template QS-TP-10.7.2
First Piece Inspection Plan and Report Templates
For all Hydra-70 Suppliers and Supplier Sub-tiers, the following templates are required for planning and reporting a First Piece Inspection.
First Piece Inspection Plan Template (FPI) QS-TP-10.7.3
First Piece Inspection Report Template (FPI) QS-TP-10.7.4
 AS9102 – General
The following document may be used by all Suppliers and Supplier Sub-tiers when validating internal changes (all programs) or when validating GD-OTS requested changes (excluding Hydra-70).
AS9102 Form QS-TP-10.0.1
Inspection and Test Equipment Validations
For all Hydra-70 Suppliers and Supplier Sub-tiers, the following templates are required to be used when planning and reporting a change to Inspection and Test Equipment.
ITE Validation Plan QS-TP-10.7.8
ITE Validation Report QS-TP-10.7.9
Corrective Action Request
The section is applicable to all Suppliers and Supplier Sub-tiers issued a Corrective Action Request and provides guidance for completion and submittal of corrective action documents. Use of these templates is mandatory.
Corrective Action Response Guide QS-GD-3.0.2
Supplier 8D Corrective Action Report QS-TP-3.0.1
Why Analysis Worksheet QS-TP-3.0.2
Audit Readiness
The section is applicable to all Suppliers and Supplier Sub-tiers and provides information useful in support of a pre-production Supplier Production Readiness Verification (SPRV) or a GD-OTS audit of a Supplier and a Suppliers Sub-tier.
SPRV QS-CK–53.17.2
Audit Template QS-CK–53.17.3
Hardware Delivery
The section is applicable to all Suppliers submitting hardware to GD-OTS. Use of this form is mandatory when called out by Contract.
CoC QS-TP-53.0.1

   Delivering The Best To The Best®


General Dynamics Ordnance and Tactical Systems is a global aerospace and defense company. We are committed to providing the U.S. military and its allies with an extensive range of overarching products that provide a cutting-edge advantage to our war fighters. A General Dynamics Company.

Follow Us